circuitnet
Sponsor
SEHO Systems GmbH
You need clear soldering results?
The SEHO PowerVision AOI system is for fast, automated optical inspection. Designed for THT processes & focusses on 2 points: Continuous quality assurance & cost-efficient production processes.
SEHO Systems GmbH
Introducing New Board-to-Board Connectors
Sponsor
Circuit Technology Center
The Right Tools for Every PCB Repair
Damaged circuit boards don't always need to be replaced. CircuitMedic offers professional-grade repair kits, tools, and materials for restoring damaged pads, traces, plated holes, and circuit board surfaces.
Circuit Technology Center
Ask the Experts
QUESTIONS
  
SUBMIT
  
MEMBERS
  
JOIN
July 2, 2007 - Updated
July 3, 2007 - Originally Posted

Any Standards on Pad Repairs?

Is there anything in IPC or other Industry Standard that would indicate the number of pads that can be replaced and/or repaired on a multi-leaded component in a single instance? This would include epoxy as well as thermbond pad repairs.

Sherri Dobroskay
Expert Panel Responses
I can't tell you how many times this question has been asked of us over the years. While the IPC 7711/7721 contains several procedures covering methods to follow to repair lifting or missing pads, it does not state, advise or recommend how many pad repairs are allowed.

Leo Lambert makes a number of excellent points in his response; the answer really boils down to what the customer will accept. We've had customers who will approve fifty or more pad repairs however we've also had other customers who will only allow up to two repairs and others that won't allow any.

Bob LePage
Bob LePage
Sales Engineer, Circuit Technology Center
Mr. LePage has been a key member of the team at Circuit Technology Center since 1996. He has vast expertise, experience and understanding of complex circuit board rework, repair and modification operations. He is one of the most knowledgeable experts in this area across the globe.
A board needing to be repaired needs to be approved by the customer as it will not meet the requirements of the initial document. Per 7711, "Repairs are generally changes to an unacceptable end product to make it acceptable in accordance with original functional requirements. The control of repaired products should be by means of Material Review Board (MRB), or its equivalent, which may consist of Design Engineering, Quality Assurance, and User representatives. The MRB, with technical support, should define the mutually acceptable repair method to be used and take the action necessary to ensure that all applicable procedures are adhered to. The maximum number of repairs per printed wiring board assembly should be determined by the using activity or agency." So how many pads can be replaced, as many as the customer will allow and still have a reliable product. The other consideration is the cost of the product and the availability of meeting the time requirements to deliver the product to the customer. All these may be involved in the decision making process of repairing or replacing the product.

Leo Lambert
Leo Lambert
Vice President, Technical Director, EPTAC Corporation
At EPTAC Corporation, Mr. Lambert oversees content of course offerings, IPC Certification programs and provides customers with expert consultation in electronics manufacturing, including RoHS/WEEE and lead free issues. Leo is also the IPC General Chairman for the Assembly/Joining Process Committee.
Submit A Comment
Comments are reviewed prior to posting. You must include your full name to have your comments posted. We will not post your email address.

Your Name


Your Company
Your E-mail


Your Country
Your Comments



Free Newsletter Subscription
Circuitnet is built for professionals who bear the responsibility of looking ahead, imagining the future, and preparing for it.

Insert Your Email Address

Sponsor
BEST Inc.
Bring IPC Training to Your Facility
Mobile training center offers IPC certified classes at your company’s facility making solder training effective and convenient for your entire team.
BEST Inc.
Focus on Storage Solutions -post APEX